Upgrade many client projects

Goal

Roll a spine-framework (and app-package) release across N client projects without drift, forgotten projects, or half-applied schemas.

Prerequisites

  • The release exists — npm view spine-framework versions shows the target version (and each app package's version).
  • A list of the client projects — for agencies this is worth keeping in one file you can loop over.
  • Each project's ## Environments ladder — upgrades walk it like any other change.

Steps

  1. Read the release notes first. The GitHub release notes name the migrations, breaking changes, and required consumer steps — they decide whether a project can take this release unmodified (e.g. a peer-floor crossing changes create-* deps).
  2. Per project, in a loop — upgrade the code:

    cd <client-project>
    npm i spine-framework@<version>
    npx spine-framework upgrade --dry-run   # what will change
    npx spine-framework upgrade             # apply — never --force on autopilot
    npm install
    npm run verify                          # frozen manifest clean

    --dry-run output worth reading: modified .framework/ files mean the project patched core — stop and resolve per-project rather than forcing.

  3. Then the schema (only if the release carries migrations — the notes say):

    npx spine-framework migrations status   # pending?
    npx spine-framework migrate             # apply — coordinate on shared DBs

    Schema-before-code matters if the project deploys continuously: migrate before the new deploy lands. On a shared Supabase, migrate is a team event (see guide/06-join-an-existing-project.md).

  4. App packages second, same pattern:

    npx spine-framework update-app <pkg>    # verifies baseline from lockfile

    Only where the app's peer range covers the new framework — the release notes say when it doesn't (peer-floor crossing = bump the scaffolder deps, see the versioning page).

  5. Walk each project's own ladder. The upgrade is a change like any other: each project's ## Environments decides gate/promote/post- landing. spine-ship walks it; the hand-off rung still waits for the client's go-ahead.
  6. Track the wave. For N projects, record per-project: version reached, migrations applied, ladder rung reached, anomalies. A simple checklist table beats a script — the failure modes are per-project and need per-project judgment.

Verify

  • Every project: npm run verify clean, migrations status shows nothing pending, its ladder walked to wherever the client allows.
  • No project left between "framework upgraded" and "migrations applied."

Common mistakes

  • --force by default — a modified .framework/ file is a forked core; forcing past it hides the fork forever. Resolve it once.
  • Upgrading code before schema — new code against old schema is the classic production break (see operations/recovery.md for the reverse trap).
  • Treating projects identically — custom netlify.toml custom_* blocks, local .framework/ edits, and per-client ## Environments ladders make every project genuinely different.
  • Forgetting update-app — upgrade syncs the framework; installed app packages need their own update-app pass.